Aerial footage of the Amtrak 501 train wreck site indicates that premeditated
sabotage may have contributed to the deadly derailment. AMTRAK strives a
culture based upon “superior safety”. Shit happens! Even though there exists convincing
eavesdropping evidence from the cock-flight lounge recorder that the train was
traveling in excess of the posted 30mph speed zone, there exists other reasons
maybe this mishap right before Christmas. The suspicious suspension of a critical
“sleeper” may have allowed upstream and downstream rail fastener failures and
thus compromised the track gage to cause a catastrophic failure. From the sky
view, it appears that the “sleeper” was removed by unorthodox means, dragged out-of-the-way
and away its integral structural meaning through remaining indications of ground
surface disturbances and subsequent run-off stains. This before the
out-of-control accident wiped away the evidence. This accident was a sabotage
and not due any maintenance activities or lack of. The failure point surrounding
this missing “sleeper” is consistent with the trajectory envelop(shrapnel dispersal)
of the main wreck, that of the locomotive and its final resting place on
Interstate 5. Speed is still a factor, but due the fact this “Inaugural
Ceremony” was late on departure, if any pressure from the powers-to-be a little
pedal for the medal, it is the recipe for disaster. Maybe under ultimate
conditions of both mechanical wherewithal and weather mild mannered, the track
could have maintained motive force integrity for the fast traveling erection
without any First Responder Emergency incident. But Casey Jones was a little
too quick for judgement that turn, especially with the track ahead missing some
critical supports. Conspiracy 101. Hey if 1 + 1…it gets the point across. Now take
also into consideration that there was ease of pedestrian access to this bridge
and the curve somewhat out in the middle of nowheresvilla, so with the correct
tools like a Dollar Store wrench made in China and a crow-bar from a local
mistress, along with some mean-spirited muscle, that wooden timber could have
been easily removed without sweat and anyone with a K-grade rail dynamics knowledge would have
realized that over a short-lived time interval there would come a failure. This was a
planned sabotage from what can be seen with the GOOGLE MAP view tools
application. Disrupt the moving economy was paramount, especially a few days
before Christmas. It all adds up, a picture is worth a thousand words alone by
itself - it "tells a story don't it". Yes, most likely “Home Grown” terrorists plotted this event. Look, the
Mayor of Lakewood has been an adamant Naysayer of this “Fast Train” concept, an
outspoken vigilante man. That packs a punch, sometimes in the wrong direction. Likewise,
fallout when Sarah Palin targeted Gabrielle Giffords, the insane are called to
duty another’s dissatisfaction with the system. A few beers, a plan is hatched
and innocent victims…SarahPAC Tough Todd Palin did what? Talk about a “Train-Wreck”
family affair! Now according to the VAMPIRE simulator used to evaluate rail
failures, the “Derailment Coefficient” increases dramatically when there is a “Sleeper
Failure”. By basically starting off with a pre-triggered event along with imminent
vibrations from train traffic, it leads to another neighbor failure then another like the Hatfield & McCoys going at it again, that which increases the “Coefficient”
exponentially and soon the lateral forces at any speed are greater then which the rail can handle and a derailment occurs - at any speed. So, maybe we best
find this missing “sleeper” that which could lead the authorities to a “Sleeper
Cell” bent on hell raising nightmares. Timothy McVeigh is alive and well…
Tuesday, December 19, 2017
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment